Projects

CLIENT:

US Navy

LOCATION:

NWS Earle, NJ

VALUE:

$ 19,425,250

REPAIR UTILITIES

For this design-build project, Nova Group Inc. served as a specialty subcontractor, performing the majority of the project work requirements. This project included the complete replacement of the utilities (potable water, sanitary sewer, and heat trace systems) along the two-mile long Trestle 1A and Wye area that had been damaged during Superstorm Sandy in October, 2012. Partial repairs were also performed on the utilities throughout Trestles 3A & 4 and Piers 3A & 4, which included potable water, sanitary sewer, and steam systems. The work also included the demolition of concrete edge beams and support beams on Trestle 1A, and the installation of 40-foot and 60-foot long precast concrete beams to support the new potable water and sanitary sewer system piping. Isolated concrete spall repairs were performed on Trestles 1A, 3A, and 4. The electrical work included demolition and the repair and replacement of damaged foundation and electrical equipment at the Shoreside Substation, Green Drive Substation, and in Buildings S63 and S455.

COMPLETION:

2016

Nova Group, Inc. is an equal opportunity employer. 

SITE MAP