REPLACE FAILED FRESHWATER PIPING AT PIER 3

This design-build project includes design, labor, materials, and equipment to replace failed freshwater piping at Pier 3. The scope of work includes complete replacement of the main water lines, service connections, valves, supports, hold downs and thrust blocks to meet or exceed full capacity of current system. The system will install freeze protection devices and components that meet energy saving directions.

AWARDED:

Mar 2015

COMPLETION:

2016