LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

Projects CLIENT: US Navy LOCATION: Bangor, WA VALUE: $21,490,000 This project constructs three elevated fixed fighting positions for the waterfront restricted area (WRA) land/water interface (LWI), along with construction of two abutments that connect both ends of the...
LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA

Projects CLIENT: US Navy LOCATION: Bremerton, WA  VALUE: $1,830,311 This design-build project replaces and upgrades an existing, removable, steel bridge at the head of Dry Dock 5 at Puget Sound Naval Shipyard & Intermediate Maintenance Facility. The existing...
LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

REPLACE SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA

Projects CLIENT: US Navy LOCATION: Bremerton, WA  VALUE: $10,692,000 This design-build project provides repairs to the saltwater distribution system, including piping supports, brackets, anchors, thrust blocks and seismic bracing, and the cathodic protection system....
LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

CONSOLIDATED DRY DOCKS A & B

Projects CLIENT: US Navy LOCATION: Pearl Harbor, HI VALUE: $13,740,169 P-474 Drydock Electrical Distribution System included modifications to drydock 480V electrical systems, including modifications and additions of switchgear to indoor 12 kV substations; replacement...