INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

Projects CLIENT: US Navy LOCATION: Naval Base Point Loma, San Diego, CA VALUE: $744,229 Nova installed two portable small boat docking systems, one north and one south of “Sierra” Pier 5002 at Naval Base Point Loma. One system was inside and one outside the waterborne...
INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

Projects CLIENT: US Navy LOCATION: Pearl Harbor, HI VALUE: $689,494 The Project requires recoating of the existing Drydock No. 1 Main Pump No. 4 pump volute. AWARDED: Sep 2013 COMPLETION: 2016 Back to Projects Nova Group, Inc. is an equal opportunity employer.  SITE...
PIER 17 REPLACEMENT

PIER 17 REPLACEMENT

Projects CLIENT: US Navy LOCATION: New London, Groton, CT VALUE: $12,572,047 The Pier 17 Replacement project had two distinct phases. The first phase of construction consisted of an upgrade to Pier 15 that included modification and additions to the utility and...
P-700 AIRCRAFT CARRIER WHARF

P-700 AIRCRAFT CARRIER WHARF

Projects CLIENT: US Navy LOCATION: Naval Air Station North Island, San Diego, CA VALUE: $67,365,143 The first phase consisted of dredging the existing harbor, disposing of the dredged material, constructing a new rock dike, filling of the area behind the dike, and...
IMPROVEMENTS TO WHARVES D, E & F

IMPROVEMENTS TO WHARVES D, E & F

Projects CLIENT: US Navy LOCATION: Mayport, FL VALUE: $18,146,879 The work included the design and construction of utility and mooring improvements to Wharf D, Berths 2, 3 and 4 including integrated site development and incidental related work to upgrade the facility...