Projects

CLIENT:

US Navy

LOCATION:

MCAS Miramar, San Diego, CA

VALUE:

$340,000

DESIGN & CONSTRUCT NEW PUMP CONTROL SYSTEM

The project required the removal and replacement of the existing outdoor, weatherproof motor control center, and the removal and replacement of all branch circuit conductors originating in the existing motor control center and feeding the existing pumps, lighting panels, valves, control panels, fire pump, and oscillating motors located at eight fuel stations. Two new 120/240V panelboards were installed in the existing distribution centers, and the 400 Hz and 28 VDC power sources and conductors located in the distribution centers were removed.

Nova also removed and replaced the existing control system including all components and interconnecting wiring, and installed a new pressure transmitter switch.

This project received the Associated Builders & Contractors National Excellence in Construction Eagle Award.

COMPLETION:

2002