by Aidan Herlong | Feb 26, 2019
Projects CLIENT: US Navy LOCATION: NB Kitsap, Bremerton, WA VALUE: $ 1,689,543 REPLACE FAILED FRESHWATER PIPING AT PIER 3 This design-build project replaced the failed freshwater piping at Pier 3 that services ships docked to the pier. The scope of work included...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: Point Loma, San Diego, CA VALUE: $66,998,675 P-151 Replace Fuel Pier; Joint Venture With Shimmick This project, a joint venture between Nova Group and Shimmick Construction, provides a double-deck fueling...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: NB Kitsap, Bremerton, WA VALUE: $ 1,148,721 Small Craft Floats & Service Pier This design-build project replaced the existing concrete marina float system with four new floats (one 36-foot, one 72-foot, one 132-foot, and...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: USACE Portland LOCATION: Bonneville Dam, OR VALUE: $31,019,669 Bonneville First Powerhouse Main Unit Circuit Breaker & Instrument Transformer Replacement, Bonneville Dam, OR This project improved the reliability and operability for the main...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 4,473,525 Drydock 4 Shorepower The project required modifications and upgrades to Drydock 4 electrical systems. This work featured modifications and additions to...