PW6 Drainage Upgrade (Phase 1) (Piping and Valves), B706
The scope of this project includes replacing existing valves 7, 8, and 9 located in the third level with butterfly valves and replacing/reconfiguring existing Clow Gate valves 7C, 8C, 9C, 9B, 10, and 11. This project also includes adding two isolation valves (Gate Valves) in between 7C and 8C, and 8C and 9C (in between Pump 1 and 2, 2 and 3) to be able to isolate pumps located in drywell/level 5, and incidental related work.
Completion:
In-Progress