Projects
CLIENT:
USACE
LOCATION:
Holloman AFB, NM
VALUE:
$23,567,188
![F42_Replace-Hydrant-Fuel-System,-Holloman-AFB,-NM_Additional-Photo-web](https://novagrp.com/wp-content/uploads/2024/05/F42_Replace-Hydrant-Fuel-System-Holloman-AFB-NM_Additional-Photo-web.jpg)
![F42_Replace-Hydrant-Fuel-System,-Holloman-AFB,-NM_Additional-Photo-2-web](https://novagrp.com/wp-content/uploads/2024/05/F42_Replace-Hydrant-Fuel-System-Holloman-AFB-NM_Additional-Photo-2-web.jpg)
![F42_Replace-Hydrant-Fuel-System,-Holloman-AFB,-NM_Additional-Photo-3-web](https://novagrp.com/wp-content/uploads/2024/05/F42_Replace-Hydrant-Fuel-System-Holloman-AFB-NM_Additional-Photo-3-web.jpg)
REPLACE HYDRANT FUEL SYSTEM
The project consisted of the construction of two 5,000-barrel operating tanks, a fuel transfer facility, a fuel analysis laboratory, an 11,000-linear-foot fuel transfer line, and all associated piping, foundations, and other appurtenances. The project included a 2,400-GPM pump house with an adjoining Petroleum Oil Lubricants (POL) operations area that include a laboratory, two standard truck offloads, two truck fill stands, associated parking for R-11s and GOVs, and other appurtenances.
COMPLETION:
2017