Projects
CLIENT:
Lawrence Livermore National Security (LLNS)
LOCATION:
Lawrence Livermore National Laboratory, CA
VALUE:
$1,461,858
Site 300 U865D T525 Replacement Project
The work included the design and installation of a new power transformer (T525) at the U865D substation, located at Lawrence Livermore Laboratory’s Site 300. This scope also included the design and installation of new switchgear sections at the existing 12kV U865D switchgear and the 12kV Bus Duct that connected the existing 12kV U865D switchgear and new transformer T525. The project also included the removal and/or modification of various existing equipment.
COMPLETION:
2021