by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,243,255 Replace/Overhaul Pump Motor No. 1 at Drydock 1, Pearl Harbor, HI This design-build project overhauled the existing Main Pump No. 1 (MP-1) at Drydock 1. Work included the...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,195,616 Replace Drain Pumps & Motors, Drydock 4, Pearl Harbor, HI This project replaced Drydock 4 drainage pumps 1 and 2, both pump motors, and associated electrical components,...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,240,785 UT Inspection & Repair Caisson, Drydock 4, Pearl Harbor, HI This project required visual and UT thickness inspections of the existing caisson plating...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: NAVFAC Northwest LOCATION: NB Kitsap, Bremerton, WA VALUE: $21,425,399 Drydock 6 Modernization and Utility Improvements, NB Kitsap, Bremerton, WA. This project included the renovation and modernization of approximately 2,500 linear feet of the...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: NB Kitsap, Bangor, WA VALUE: $22,077,867 Land-Water Interface, Bangor, WA This project constructed three elevated fixed fighting positions for the waterfront restricted area (WRA) land/water interface (LWI), along with...