by Aidan Herlong | Apr 23, 2020
Projects CLIENT: US Navy LOCATION: NAS North Island, CA VALUE: $11,475,160 Replace Fuel Storage Tanks This project involved the construction of four new 13,500-barrel aboveground jet fuel (JP-5) bulk storage tanks with cathodic protection, leak detection,...
by Aidan Herlong | Apr 23, 2020
Projects CLIENT: USACE LOCATION: Davis-Monthan AFB, AZ VALUE: $20,032,340 Type III Hydrant Fuel System, Davis-Monthan AFB, AZ This project constructed a JP-8 Type III hydrant fueling system serving 9 aircraft parking positions, each hot pit capable, complete...
by Aidan Herlong | Apr 22, 2020
Projects CLIENT: USACE Los Angeles LOCATION: Nellis AFB, NV VALUE: $9,200,944 POL Fillstand Addition This project constructed two new truck fill stands to support the fuel requirements of additional F-35A aircraft arriving at Nellis Air Force Base. The new fill...
by Aidan Herlong | Apr 22, 2020
Projects CLIENT: US Navy LOCATION: Bremerton, WA VALUE: $4,874,255 Repair Concrete & Settlement Mitigation at Drydock 6 This design-build project performed concrete repairs in several locations in the dewatering discharge tunnel of Drydock 6. The repairs...
by Aidan Herlong | Apr 22, 2020
Projects CLIENT: US Navy LOCATION: Ford Island, HI VALUE: $ 1,909,980 S375 Wharf Repairs, Ford Island, HI The project included the replacement of finger piers 1 through 7 and the access pier between them. All existing piles, pile caps, and beams parallel with...