BRAVO 1 PIER REPAIR, Pearl Harbor, HI

BRAVO 1 PIER REPAIR, Pearl Harbor, HI

Projects  CLIENT: US Navy  LOCATION: Pearl Harbor, HI  VALUE: $ 6,295,579 BRAVO 1 PIER REPAIR, Pearl Harbor, HI Demolition work included removal of the fendering system, including 66 piles, 21,000 square feet of AC paving, approximately 400...
REPAIR UTILITIES

REPAIR UTILITIES

Projects  CLIENT: US Navy  LOCATION: NWS Earle, NJ  VALUE: $ 19,425,250 REPAIR UTILITIES For this design-build project, Nova Group Inc. served as a specialty subcontractor, performing the majority of the project work requirements. This project...
LAND-BASED SHIP HANDLING FACILITY

LAND-BASED SHIP HANDLING FACILITY

Projects  CLIENT: US Navy  LOCATION: Curtis Bay, MD  VALUE: $10,420,129 LAND-BASED SHIP HANDLING FACILITY Nova’s Ship Handling Facility project provided the U.S. Coast Guard with the largest Syncrolift ship lift facility in the continental...
P-700A BERTHING WHARF, PHASE 2, San Diego, CA

P-700A BERTHING WHARF, PHASE 2, San Diego, CA

Projects  CLIENT: US Navy  LOCATION: Naval Base San Diego, CA  VALUE: $45,046,854 P-700A BERTHING WHARF, PHASE 2, San Diego, CA ​The Navy needed to expand its existing berthing capability for homeported CVNs, and the project provided a new wharf that would allow...
CVN MAINTENANCE PIER REPLACEMENT, Bremerton, WA

CVN MAINTENANCE PIER REPLACEMENT, Bremerton, WA

Projects  CLIENT: US Navy  LOCATION: NB Kitsap, Bremerton, WA  VALUE: $139,763,653 CVN MAINTENANCE PIER REPLACEMENT, Bremerton, WA This design-build pier replacement project constructed a new 120-foot wide concrete pier with over 2,200 linear feet of berthing,...