by bscadmin | Jul 19, 2023
Projects CLIENT: NAVFAC Northwest LOCATION: NB Kitsap, Bremerton, WA VALUE: $6,412,777 Refurbish Main Dewatering Pump #1, Pumpwell 2 The goal of this design-build project is to overhaul one of the drydock dewatering pumps at Pumpwell 2 to restore pump...
by bscadmin | Apr 18, 2023
Projects CLIENT: NAVFAC Northwest LOCATION: NB Kitsap, Bangor, WA VALUE: $9,450,000 Replace Delta Pier Switching Station, B/7035 The scope of work associated with subproject B7035 is to replace the entire switchgear building with a new drop-in-place, turn-key...
by bscadmin | Jan 24, 2023
Projects CLIENT: US Navy LOCATION: Puget Sound Naval Shipyard, Bremerton, WA VALUE: $4,893,127 Refurbish Main Dewatering Pump #2, Pumpwell 2 This design-build project at the historic Pumpwell 2 is a follow up to an earlier uncompleted effort to execute similar...
by bscadmin | Jul 22, 2022
Projects CLIENT: US Navy LOCATION: Ford Island, HI VALUE: $ 1,909,980 S375 Wharf Repairs, Ford Island, HI The project included the replacement of finger piers 1 through 7 and the access pier between them. All existing piles, pile caps, and beams parallel with...
by bscadmin | Apr 22, 2020
Projects CLIENT: US Navy LOCATION: NB Kitsap, Bremerton, WA VALUE: $4,874,255 Repair Concrete at Drydock 6 This design-build project performs concrete repairs in several locations in the dewatering discharge tunnel of Drydock 6. The repairs address areas of...