LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

Projects  CLIENT: US Navy  LOCATION: Bangor, WA  VALUE: $21,490,000 LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA This project constructs three elevated fixed fighting positions for the waterfront restricted area (WRA) land/water...
LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA

Projects CLIENT: US Navy LOCATION: Bremerton, WA  VALUE: $1,830,311 This design-build project replaces and upgrades an existing, removable, steel bridge at the head of Dry Dock 5 at Puget Sound Naval Shipyard & Intermediate Maintenance Facility. The existing...
LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

CONSOLIDATED DRY DOCKS A & B

Projects  CLIENT: US Navy  LOCATION: Pearl Harbor, HI  VALUE: $13,740,169 CONSOLIDATED DRY DOCKS A & B P-474 Drydock Electrical Distribution System included modifications to drydock 480V electrical systems, including modifications and...
INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

Projects  CLIENT: US Navy  LOCATION: Naval Base Point Loma, San Diego, CA  VALUE: $744,229 INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS Nova installed two portable small boat docking systems, one north and one south of “Sierra” Pier 5002 at Naval...
LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

Projects CLIENT: US Navy LOCATION: Pearl Harbor, HI VALUE: $689,494 The Project requires recoating of the existing Drydock No. 1 Main Pump No. 4 pump volute. AWARDED: Sep 2013 COMPLETION: 2016 Back to Projects Nova Group, Inc. is an equal opportunity employer.  SITE...