INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

Projects  CLIENT: US Navy  LOCATION: Naval Base Point Loma, San Diego, CA  VALUE: $744,229 INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS Nova installed two portable small boat docking systems, one north and one south of “Sierra” Pier 5002 at Naval...
INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

Projects CLIENT: US Navy LOCATION: Pearl Harbor, HI VALUE: $689,494 The Project requires recoating of the existing Drydock No. 1 Main Pump No. 4 pump volute. AWARDED: Sep 2013 COMPLETION: 2016 Back to Projects Nova Group, Inc. is an equal opportunity employer.  SITE...
INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

PIER 17 REPLACEMENT

Projects  CLIENT: US Navy  LOCATION: New London, Groton, CT  VALUE: $12,572,047 PIER 17 REPLACEMENT The Pier 17 Replacement project had two distinct phases. The first phase of construction consisted of an upgrade to Pier 15 that included...
INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

P-700 AIRCRAFT CARRIER WHARF

Projects  CLIENT: US Navy  LOCATION: Naval Air Station North Island, San Diego, CA  VALUE: $67,365,143 P-700 AIRCRAFT CARRIER WHARF The first phase consisted of dredging the existing harbor, disposing of the dredged material, constructing a new...
INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

IMPROVEMENTS TO WHARVES D, E & F

Projects CLIENT: US Navy LOCATION: Mayport, FL VALUE: $18,146,879 The work included the design and construction of utility and mooring improvements to Wharf D, Berths 2, 3 and 4 including integrated site development and incidental related work to upgrade the facility...