by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,240,785 UT Inspection & Repair Caisson, Drydock 4, Pearl Harbor, HI This project required visual and UT thickness inspections of the existing caisson plating...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: NAVFAC Northwest LOCATION: Bremerton, WA VALUE: $21,425,399 Drydock 6 Modernization and Utility Improvements, Bremerton, WA This project included the renovation and modernization of approximately 2,500 linear feet of the Drydock 6 service tunnel...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: NB Kitsap, Bangor, WA VALUE: $22,077,867 Land-Water Interface, Bangor, WA This project constructed three elevated fixed fighting positions for the waterfront restricted area (WRA) land/water interface (LWI), along with...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Indian Island, WA VALUE: $7,425,000 Ammunition Pier Structural Integrity Repairs, Indian Island, WA This project required the removal of 9 existing concrete piles followed by the installation of 9 new concrete piles. Existing...
by Aidan Herlong | Apr 20, 2020
Projects CLIENT: US NAVY LOCATION: NB Kitsap, Bremerton, WA VALUE: $2,368,000 Replace Saltwater Risers at Pier 5, NB Kitsap, Bremerton, WA This project includes the design and construction to replace the saltwater piping and risers on Pier #5, B/715, at Naval...