by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: McChord AFB, WA VALUE: $14,836,571 C17 RAMP, HYDRANT FUELS SYSTEM This new military Type III 2,400-gallon-per-minute (GPM) pressurized hydrant fueling system included 155,000 square feet of new PCC concrete...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Hurlburt Field, FL VALUE: $15,206,516 CONSTRUCT FUEL STORAGE FACILITY This project constructed 7,200 linear feet of aviation fuel transfer pipeline with secondary containment piping, leak detection system, pig launch and...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: McConnell AFB, KS VALUE: $15,880,434 HYDRANT FUEL SYSTEM This project included the provision of a 2,400-Gallon-Per-Minute hydrant fueling system and connection to twelve new hydrant pits. The system included new hydrant fuel pits...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Tinker AFB, OK VALUE: $31,934,793 DLA FUEL DISTRIBUTION FACILITIES; Tinker AFB, Tulsa, OK This project constructed a new Type III Fueling Hydrant System with a new pumphouse and the replacement of 11,000 linear feet of fiberglass...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Nevatim Israeli AFB, Israel VALUE: $13,910,067 JET FUEL SYSTEM; Nevatim AFB, Israel The project included the new construction of a fuel distribution system that consisted of a main distribution piping line...