by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: NB Kitsap, Bremerton, WA VALUE: $ 1,148,721 Small Craft Floats & Service Pier This design-build project replaced the existing concrete marina float system with four new floats (one 36-foot, one 72-foot, one 132-foot, and...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: USACE Portland LOCATION: Bonneville Dam, OR VALUE: $31,019,669 Bonneville First Powerhouse Main Unit Circuit Breaker & Instrument Transformer Replacement, Bonneville Dam, OR This project improved the reliability and operability for the main...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 4,473,525 Drydock 4 Shorepower The project required modifications and upgrades to Drydock 4 electrical systems. This work featured modifications and additions to...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: MCB Kaneohe, HI VALUE: $26,592,457 Airfield Lighting Modernization At Mcb Kaneohe, Hi This project required the demolition of existing airfield lighting and installation of a new airfield lighting and navigational aids (NAVAID)...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: U.S. Department of Energy LOCATION: Lawrence Livermore National Laboratory, CA VALUE: $24,160,308 Expand Electrical Distribution System At Lawrence Livermore National Laboratory, Ca This design-build project provided a new underground 15 kV...