Consolidated Fuel Projects, Phases 2 & 5

Consolidated Fuel Projects, Phases 2 & 5

Projects  CLIENT: US Navy  LOCATION: Andersen AFB, Guam  VALUE: $28,101,869 Consolidated Fuel Projects, Phases 2 & 5 This project was a combination of two phases into a single project as follows. Phase 2: Phase 2 installed a new Type III...
Repair Bulk Fuel Storage Tanks

Repair Bulk Fuel Storage Tanks

Projects  CLIENT: US Navy  LOCATION: Travis AFB, CA  VALUE: $6,112,563 Repair Bulk Fuel Storage Tanks This project repaired two 55,000-barrel bulk JP-8 fuel storage tanks. Repairs included one new 100-foot diameter concrete ringwall foundation...
Replace Fuel Storage Tanks

Replace Fuel Storage Tanks

Projects  CLIENT: US Navy  LOCATION: NAS North Island, CA  VALUE: $11,475,160 Replace Fuel Storage Tanks This project involved the construction of four new 13,500-barrel aboveground jet fuel (JP-5) bulk storage tanks with cathodic protection,...
Type III Hydrant Fuel System, Arizona

Type III Hydrant Fuel System, Arizona

Projects  CLIENT: USACE  LOCATION: Davis-Monthan AFB, AZ  VALUE: $20,032,340 Type III Hydrant Fuel System, Arizona This project constructed a JP-8 Type III hydrant fueling system serving 9 aircraft parking positions, each hot pit capable,...
POL Fillstand Addition

POL Fillstand Addition

Projects  CLIENT: USACE Los Angeles  LOCATION: Nellis AFB, NV  VALUE: $9,200,944 POL Fillstand Addition This project constructed two new truck fill stands to support the fuel requirements of additional F-35A aircraft arriving at Nellis Air Force Base. The new fill...