by Aidan Herlong | Jul 1, 2020
Projects CLIENT: USACE LOCATION: Nellis AFB, NV VALUE: $11,694,590 TYPE III HYDRANT FUEL SYSTEM LAYOUT TEST This project included a new Hydrant Fuel Pumphouse, a 3,500-square-foot single-story pump room with a control room to house the...
by Aidan Herlong | May 7, 2020
Projects CLIENT: USACE LOCATION: Nellis AFB, NV VALUE: $11,694,590 TYPE III HYDRANT FUEL SYSTEM, Nellis AFB, NV This project included a new Hydrant Fuel Pumphouse, a 3,500-square-foot single-story pump room with a control room to house the control panels; a...
by Aidan Herlong | Apr 23, 2020
Projects CLIENT: US Navy LOCATION: US Naval Support Facility Diego Garcia, British Indian Ocean Territory VALUE: $6,626,727 Repair Hydrant Fuel System This upgrade to a military Type III, 2,400-Gallon-Per-Minute (GPM) pressurized hydrant...
by Aidan Herlong | Apr 23, 2020
Projects CLIENT: US Navy LOCATION: Andersen AFB, Guam VALUE: $28,101,869 Consolidated Fuel Projects, Phases 2 & 5 This project was a combination of two phases into a single project as follows. Phase 2: Phase 2 installed a new Type III...
by Aidan Herlong | Apr 23, 2020
Projects CLIENT: US Navy LOCATION: Travis AFB, CA VALUE: $6,112,563 Repair Bulk Fuel Storage Tanks This project repaired two 55,000-barrel bulk JP-8 fuel storage tanks. Repairs included one new 100-foot diameter concrete ringwall foundation...