by bscadmin | Jan 9, 2021
Projects CLIENT: USACE Sacramento LOCATION: Fresno ANGB, CA VALUE: $17,440,854 Replace Jet Fuel Complex at Fresno ANGB, CA The work of this project at the Fresno Air National Guard Base in California, included the demolition of an existing fuel system that...
by bscadmin | Aug 17, 2020
Projects CLIENT: Burns & McDonnell LOCATION: San Diego International Airport, CA VALUE: $9,918,059 Additional Storage Tanks, San Diego International Airport, CA The work of this project was to construct three new 27,000-barrel above ground storage tanks at...
by bscadmin | Jul 1, 2020
Projects CLIENT: USACE LOCATION: Nellis AFB, NV VALUE: $11,694,590 TYPE III HYDRANT FUEL SYSTEM LAYOUT TEST This project included a new Hydrant Fuel Pumphouse, a 3,500-square-foot single-story pump room with a control room to house the...
by bscadmin | May 7, 2020
Projects CLIENT: USACE LOCATION: Nellis AFB, NV VALUE: $11,694,590 TYPE III HYDRANT FUEL SYSTEM Copy This project included a new Hydrant Fuel Pumphouse, a 3,500-square-foot single-story pump room with a control room to house the control...
by bscadmin | Apr 23, 2020
Projects CLIENT: US Navy LOCATION: US Naval Support Facility Diego Garcia, British Indian Ocean Territory VALUE: $6,626,727 Repair Hydrant Fuel System This upgrade to a military Type III, 2,400-Gallon-Per-Minute (GPM) pressurized hydrant...