Replace Jet Fuel Complex at Fresno ANGB, CA

Replace Jet Fuel Complex at Fresno ANGB, CA

Projects  CLIENT: USACE Sacramento  LOCATION: Fresno ANGB, CA  VALUE: $17,440,854 Replace Jet Fuel Complex at Fresno ANGB, CA The work of this project at the Fresno Air National Guard Base in California, included the demolition of an existing fuel system that...
Additional Storage Tanks, San Diego International Airport, CA

Additional Storage Tanks, San Diego International Airport, CA

Projects  CLIENT: Burns & McDonnell  LOCATION: San Diego International Airport, CA  VALUE: $9,918,059 Additional Storage Tanks, San Diego International Airport, CA The work of this project was to construct three new 27,000-barrel above ground storage tanks at...
TYPE III HYDRANT FUEL SYSTEM LAYOUT TEST

TYPE III HYDRANT FUEL SYSTEM LAYOUT TEST

Projects  CLIENT: USACE  LOCATION: Nellis AFB, NV  VALUE: $11,694,590 TYPE III HYDRANT FUEL SYSTEM LAYOUT TEST This project included a new Hydrant Fuel Pumphouse, a 3,500-square-foot single-story pump room with a control room to house the...
TYPE III HYDRANT FUEL SYSTEM LAYOUT TEST

TYPE III HYDRANT FUEL SYSTEM Copy

Projects  CLIENT: USACE  LOCATION: Nellis AFB, NV  VALUE: $11,694,590 TYPE III HYDRANT FUEL SYSTEM Copy This project included a new Hydrant Fuel Pumphouse, a 3,500-square-foot single-story pump room with a control room to house the control...
Repair Hydrant Fuel System

Repair Hydrant Fuel System

Projects  CLIENT: US Navy  LOCATION: US Naval Support Facility Diego Garcia, British Indian Ocean Territory  VALUE: $6,626,727 Repair Hydrant Fuel System This upgrade to a military Type III, 2,400-Gallon-Per-Minute (GPM) pressurized hydrant...