CONSTRUCT FUEL STORAGE FACILITY

CONSTRUCT FUEL STORAGE FACILITY

Projects  CLIENT: USACE  LOCATION: Hurlburt Field, FL  VALUE: $15,206,516 CONSTRUCT FUEL STORAGE FACILITY This project constructed 7,200 linear feet of aviation fuel transfer pipeline with secondary containment piping, leak detection system, pig launch and...
HYDRANT FUEL SYSTEM

HYDRANT FUEL SYSTEM

Projects  CLIENT: USACE  LOCATION: McConnell AFB, KS  VALUE: $15,880,434 HYDRANT FUEL SYSTEM This project included the provision of a 2,400-Gallon-Per-Minute hydrant fueling system and connection to twelve new hydrant pits. The system included new hydrant fuel pits...
CONSTRUCT FUEL STORAGE FACILITY

AIRCRAFT DIRECT FUELING STATION

Projects  CLIENT: US Navy  LOCATION: NAF El Centro, CA  VALUE: $8,340,959 AIRCRAFT DIRECT FUELING STATION This project includes construction of an additional direct refueling station with four fueling stations to support existing and future aviation detachments...
ROTARY APRON & HYDRANT FUEL SYSTEM

ROTARY APRON & HYDRANT FUEL SYSTEM

Projects  CLIENT: US Navy  LOCATION: MCAS Yuma, AZ  VALUE: $11,485,722 ROTARY APRON & HYDRANT FUEL SYSTEM This project provided a 100,000-square-foot, ten-inch thick Portland Cement Concrete (PCC) Rotary Wing Fueling Apron, and included construction of two...
CONSTRUCT FUEL STORAGE FACILITY

UPGRADE HYDRANT FUELING SYSTEM, PHASE 1

Projects  CLIENT: USACE  LOCATION: Dover AFB, DE  VALUE: $13,400,027 UPGRADE HYDRANT FUELING SYSTEM, PHASE 1 The base’s existing fueling system was to be upgraded to a Type III military hydrant fueling system. The project involved the...