UPGRADE HYDRANT FUELING SYSTEM

UPGRADE HYDRANT FUELING SYSTEM

Projects  CLIENT: US Navy  LOCATION: Barksdale AFB, LA  VALUE: $11,250,662 UPGRADE HYDRANT FUELING SYSTEM Nova provided significant upgrades to the base’s existing hydrant fuel system, including the construction of a new 6,100-square foot...
REPLACE HYDRANT FUEL SYSTEM

REPLACE HYDRANT FUEL SYSTEM

Projects  CLIENT: USACE  LOCATION: Hickam AFB, Hawaii  VALUE: $28,998,493 REPLACE HYDRANT FUEL SYSTEM This project replaced two existing Type II hydrant fuel systems with one Type III pressurized system with a minimum pumping capacity of 3,000...
REPLACE FUEL STORAGE & LOAD FACILITIES

REPLACE FUEL STORAGE & LOAD FACILITIES

Projects  CLIENT: USACE  LOCATION: Cannon AFB, NM  VALUE: $12,571,864 REPLACE FUEL STORAGE & LOAD FACILITIES This project consisted of replacing the fuel storage and loading facilities and included the pump house, three jet fuel tanks, two...
REPLACE FUEL STORAGE

REPLACE FUEL STORAGE

Projects  CLIENT: USACE  LOCATION: Edwards AFB, CA  VALUE: $20,648,746 REPLACE FUEL STORAGE This project included the demolition of the majority of the existing Bulk Fuel Storage Farm and the construction of a new fueling facility at the main base flight line to be...