by Aidan Herlong | May 22, 2019
Projects CLIENT: US Navy LOCATION: Barksdale AFB, LA VALUE: $11,250,662 UPGRADE HYDRANT FUELING SYSTEM Nova provided significant upgrades to the base’s existing hydrant fuel system, including the construction of a new 6,100-square foot...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Hickam AFB, Hawaii VALUE: $28,998,493 REPLACE HYDRANT FUEL SYSTEM This project replaced two existing Type II hydrant fuel systems with one Type III pressurized system with a minimum pumping capacity of 3,000...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Cannon AFB, NM VALUE: $12,571,864 REPLACE FUEL STORAGE & LOAD FACILITIES This project consisted of replacing the fuel storage and loading facilities and included the pump house, three jet fuel tanks, two...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Edwards AFB, CA VALUE: $20,648,746 REPLACE FUEL STORAGE This project included the demolition of the majority of the existing Bulk Fuel Storage Farm and the construction of a new fueling facility at the main base flight line to be...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Hunter AAF, GA VALUE: $13,503,915 FUEL ISLAND UPGRADE; JOINT VENTURE WITH UNDERGROUND CONSTRUCTION This project included the construction of two 5,000-barrel aboveground fuel storage tanks, a 1,800-gallon-per minute pumphouse,...