by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: Holloman AFB, NM VALUE: $23,567,188 REPLACE HYDRANT FUEL SYSTEM The project consisted of the construction of two 5,000-barrel operating tanks, a fuel transfer facility, a fuel analysis laboratory, an 11,000-linear-foot fuel...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USACE LOCATION: AASF #2, Marana, AZ VALUE: $1,426,014 Repairs To Fuel Facilities At AASF #2, Marana, AZ This project included several repairs to the facility. There were repairs to cracks and joints on the concrete drive facility and tank...