by Aidan Herlong | May 22, 2019
Projects CLIENT: US Navy LOCATION: Andersen AFB, Guam VALUE: $17,467,698 REPLACE POL HYDRANT FUELING SYSTEM, PHASE 1 This new type III hydrant fueling system included a new 2,400-Gallon-Per-Minute (GPM) pumphouse consisting of a structural...
by Aidan Herlong | May 22, 2019
Projects CLIENT: US Navy LOCATION: Travis AFB, CA VALUE: $13,360,477 TYPE III HYDRANT FUEL SYSTEM This project consisted of updating an old Type II hydrant fueling system to meet the requirements of a new revised DOD Type III system. The project included...
by Aidan Herlong | May 22, 2019
Projects CLIENT: USCOE LOCATION: Altus AFB, OK VALUE: $9,287,547 RECONFIGURE APRON & HYDRANT FUEL SYSTEM Nova was awarded a contract to convert an existing hydrant system to a Type III hydrant fueling system. The project involved the...
by Aidan Herlong | May 22, 2019
Projects CLIENT: US Navy LOCATION: MCAS Miramar, San Diego, CA VALUE: $340,000 DESIGN & CONSTRUCT NEW PUMP CONTROL SYSTEM The project required the removal and replacement of the existing outdoor, weatherproof motor control center, and...
by Aidan Herlong | May 22, 2019
Projects CLIENT: US Navy LOCATION: MCAS Yuma, AZ VALUE: $12,154,940 FIXED WING FUELING SYSTEM & APRON This project expanded the fuel system for a new airfield refueling apron on a fully-operational airfield. This new aircraft hydrant fueling system...