by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,195,616 Replace Drain Pumps & Motors, Drydock 4, Pearl Harbor, HI This project replaced Drydock 4 drainage pumps 1 and 2, both pump motors, and associated electrical components,...
by Aidan Herlong | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,240,785 UT Inspection & Repair Caisson, Drydock 4, Pearl Harbor, HI This project required visual and UT thickness inspections of the existing caisson plating...
by Aidan Herlong | Apr 20, 2020
Projects CLIENT: US NAVY LOCATION: NB Kitsap, Bremerton, WA VALUE: $2,368,000 Replace Saltwater Risers at Pier 5, NB Kitsap, Bremerton, WA This project includes the design and construction to replace the saltwater piping and risers on Pier #5, B/715, at Naval...
by Aidan Herlong | May 20, 2019
Projects CLIENT: US Navy LOCATION: NB Kitsap Bremerton, WA VALUE: $ 1,830,311 REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA This design-build project replaced and upgraded an existing, removable steel bridge at the head of Drydock 5 at...
by Aidan Herlong | May 20, 2019
Projects CLIENT: NAVFAC Northwest LOCATION: Bremerton, WA VALUE: $13,789,581 REPAIR SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA This design-build project provided structural repairs and upgrades to the saltwater distribution system including piping...