Replace Drain Pumps & Motors, Drydock 4, Pearl Harbor, HI

Replace Drain Pumps & Motors, Drydock 4, Pearl Harbor, HI

Projects  CLIENT: US NAVY  LOCATION: Pearl Harbor Naval Shipyard, HI  VALUE: $ 1,195,616 Replace Drain Pumps & Motors, Drydock 4, Pearl Harbor, HI This project replaced Drydock 4 drainage pumps 1 and 2, both pump motors, and associated electrical components,...

Replace Saltwater Risers at Pier 5, NB Kitsap, Bremerton, WA

Projects  CLIENT: US NAVY  LOCATION: NB Kitsap, Bremerton, WA  VALUE: $2,368,000 Replace Saltwater Risers at Pier 5, NB Kitsap, Bremerton, WA This project includes the design and construction to replace the saltwater piping and risers on Pier #5, B/715, at Naval...
REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA

REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA

Projects  CLIENT: US Navy  LOCATION: NB Kitsap Bremerton, WA  VALUE: $ 1,830,311 ​ REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA This design-build project replaced and upgraded an existing, removable steel bridge at the head of Drydock 5 at...
REPAIR SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA

REPAIR SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA

Projects  CLIENT: NAVFAC Northwest  LOCATION: Bremerton, WA   VALUE: $13,789,581 REPAIR SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA This design-build project provided structural repairs and upgrades to the saltwater distribution system including piping...