CONSOLIDATED DRY DOCKS A & B, Pearl Harbor, HI

CONSOLIDATED DRY DOCKS A & B, Pearl Harbor, HI

Projects  CLIENT: US Navy  LOCATION: Pearl Harbor Naval Shipyard, HI  VALUE: $ 13,740,169 CONSOLIDATED DRY DOCKS A & B, Pearl Harbor, HI This task order consolidated two separate projects in Drydock 2. Project A, P-474 Drydock Electrical...
INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

Projects  CLIENT: US Navy  LOCATION: Naval Base Point Loma, San Diego, CA  VALUE: $744,229 INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS Nova installed two portable small boat docking systems, one north and one south of “Sierra” Pier 5002 at Naval...
INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

Projects  CLIENT: US Navy  LOCATION: Pearl Harbor, HI  VALUE: $689,494 INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1 The Project requires recoating of the existing Drydock No. 1 Main Pump No. 4 pump volute. AWARDED: Sep 2013...
INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

PIER 17 REPLACEMENT

Projects  CLIENT: US Navy  LOCATION: New London, Groton, CT  VALUE: $12,572,047 PIER 17 REPLACEMENT The Pier 17 Replacement project had two distinct phases. The first phase of construction consisted of an upgrade to Pier 15 that included...
IMPROVEMENTS TO WHARVES D, E & F

IMPROVEMENTS TO WHARVES D, E & F

Projects  CLIENT: US Navy  LOCATION: Naval Station Mayport, FL  VALUE: $ 18,146,879 IMPROVEMENTS TO WHARVES D, E & F The work included the design and construction of utility and mooring improvements to Wharf D, Berths 2, 3, and 4,...