by bscadmin | Apr 22, 2020
Projects CLIENT: US Navy LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,267,000 Replace Drain Pump Motors, Pearl Harbor, HI This design-build project replaced two 2300V drain pump motors at Pumpwell S-17 in Drydock 1. The work included removal of the...
by bscadmin | Apr 21, 2020
Projects CLIENT: US Navy LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 5,817,897 Drydock 1 Concrete Wall Repairs, Pearl Harbor, HI The project included the repair of spalls, deteriorated concrete, and leaks in the concrete walls of the alters, galleries,...
by bscadmin | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 2,724,146 Drydock 1 Overhaul Pumps 2 & 3, Pearl Harbor, HI The work included overhaul of two main pumps and motors for Drydock 1. The overhaul included correcting the shaft...
by bscadmin | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,243,255 Replace/Overhaul Pump Motor No. 1 at Drydock 1, Pearl Harbor, HI This design-build project overhauled the existing Main Pump No. 1 (MP-1) at Drydock 1. Work included the...
by bscadmin | Apr 21, 2020
Projects CLIENT: US NAVY LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 1,195,616 Replace Drain Pumps & Motors, Drydock 4, Pearl Harbor, HI This project replaced Drydock 4 drainage pumps 1 and 2, both pump motors, and associated electrical components,...