by Aidan Herlong | Feb 26, 2019
Projects CLIENT: US Navy LOCATION: NB Kitsap, Bremerton, WA VALUE: $3,643,486 DRYDOCK 4 & 5 SERVICE GALLERY REPAIRS NB Kitsap, Bremerton, WA This project included concrete repairs in the utility galleries and tunnels of Drydocks 4 and 5. The scope of the...
by Aidan Herlong | Feb 26, 2019
Projects CLIENT: US Navy LOCATION: NB Point Loma, San Diego, CA VALUE: $7,023,000 PIER 5000 DECK REPAIR The work consisted of repairs to Pier 5000′s concrete deck to include delaminations, cracks, pile spalls, and exposed and corroded rebar located on the pier’s...
by Aidan Herlong | Feb 26, 2019
Projects CLIENT: US Navy LOCATION: Bremerton, WA VALUE: $1,609,192 Perform Sewer Repairs This design-build project provided sewer utility forcemain repairs in the southwest area of Naval Base Kitsap at Bremerton. A portion of the sanitary sewer force main was...
by Aidan Herlong | Feb 26, 2019
Projects CLIENT: US Navy LOCATION: NB Kitsap, Bremerton, WA VALUE: $ 1,689,543 REPLACE FAILED FRESHWATER PIPING AT PIER 3 This design-build project replaced the failed freshwater piping at Pier 3 that services ships docked to the pier. The scope of work included...
by Aidan Herlong | Feb 13, 2019
Projects CLIENT: US Navy LOCATION: Point Loma, San Diego, CA VALUE: $66,998,675 P-151 Replace Fuel Pier; Joint Venture With Shimmick This project, a joint venture between Nova Group and Shimmick Construction, provides a double-deck fueling...