Repair Concrete & Settlement Mitigation at Drydock 6

Repair Concrete & Settlement Mitigation at Drydock 6

Projects  CLIENT: US Navy  LOCATION: Bremerton, WA  VALUE: $4,874,255 Repair Concrete & Settlement Mitigation at Drydock 6 This design-build project performed concrete repairs in several locations in the dewatering discharge tunnel of Drydock 6. The repairs...
S375 Wharf Repairs, Ford Island, HI

S375 Wharf Repairs, Ford Island, HI

Projects  CLIENT: US Navy  LOCATION: Ford Island, HI  VALUE: $ 1,909,980 S375 Wharf Repairs, Ford Island, HI The project included the replacement of finger piers 1 through 7 and the access pier between them.  All existing piles, pile caps, and beams parallel with...
S375 Wharf Repairs, Ford Island, HI

Pier Concrete Repairs, NB Coronado, CA

Projects  CLIENT: US Navy  LOCATION: NB Coronado, CA  VALUE: $ 2,989,000 Pier Concrete Repairs, NB Coronado, CA The project included numerous concrete spall repairs to ten different piers at the Naval Amphibious Base. Repairs were made to Piers 3, 5, 8, 9, 10, 11,...
Drydock 6 Floor Repairs, NB Kitsap, Bremerton, WA

Drydock 6 Floor Repairs, NB Kitsap, Bremerton, WA

Projects  CLIENT: US Navy  LOCATION: NB Kitsap, Bremerton, WA  VALUE: $ 9,413,065 Drydock 6 Floor Repairs, NB Kitsap, Bremerton, WA The purpose of the project was to stop the settlement of a 100-foot-wide by 250-foot-long section of the drydock concrete floor slab...
S375 Wharf Repairs, Ford Island, HI

Drydock 2 Wall & Service Gallery, Pearl Harbor, HI

Projects  CLIENT: US Navy  LOCATION: Pearl Harbor Naval Shipyard, HI  VALUE: $ 2,275,250 Drydock 2 Wall & Service Gallery, Pearl Harbor, HI This project included concrete removal work and concrete rehabilitation of cracks, spalls, delaminations, leaking...