by Aidan Herlong | May 20, 2019
Projects CLIENT: US Navy LOCATION: Pearl Harbor Naval Shipyard, HI VALUE: $ 13,740,169 CONSOLIDATED DRY DOCKS A & B, Pearl Harbor, HI This task order consolidated two separate projects in Drydock 2. Project A, P-474 Drydock Electrical...
by Aidan Herlong | May 20, 2019
Projects CLIENT: US Navy LOCATION: Naval Base Point Loma, San Diego, CA VALUE: $744,229 INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS Nova installed two portable small boat docking systems, one north and one south of “Sierra” Pier 5002 at Naval...
by Aidan Herlong | May 20, 2019
Projects CLIENT: US Navy LOCATION: Pearl Harbor, HI VALUE: $689,494 INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1 The Project requires recoating of the existing Drydock No. 1 Main Pump No. 4 pump volute. AWARDED: Sep 2013...
by Aidan Herlong | May 20, 2019
Projects CLIENT: US Navy LOCATION: New London, Groton, CT VALUE: $12,572,047 PIER 17 REPLACEMENT The Pier 17 Replacement project had two distinct phases. The first phase of construction consisted of an upgrade to Pier 15 that included...
by Aidan Herlong | May 20, 2019
Projects CLIENT: US Navy LOCATION: Naval Air Station North Island, San Diego, CA VALUE: $67,365,143 P-700 AIRCRAFT CARRIER WHARF; Naval Air Station North Island, San Diego, CA The first phase consisted of dredging the existing harbor,...