Replace Type III Hydrant Fuel System

Replace Type III Hydrant Fuel System

Projects  CLIENT: USACE Omaha  LOCATION: General Billy Mitchell ANGB, Milwaukee, WI  VALUE: $35,987,647 Replace Type III Hydrant Fuel System This project at the General Billy Mitchell Air National Guard Base in Milwaukee, Wisconsin, includes constructing a new...
Fuel Receipt Area & Storage Tank

Fuel Receipt Area & Storage Tank

Projects  CLIENT: USACE Sacramento  LOCATION: Beale AFB, CA  VALUE: $15,017,509 Fuel Receipt Area & Storage Tank This project at Beale AFB consisted of constructing a new 10,000-barrel jet fuel (JP-8) tank, a transfer pumphouse with two 600 gallon-per-minute...
KC-46A ADAL Hydrant Fuel System & Pavement

KC-46A ADAL Hydrant Fuel System & Pavement

Projects  CLIENT: Ross Group/US Navy  LOCATION: Travis AFB, CA  VALUE: $3,515,000 KC-46A ADAL Hydrant Fuel System & Pavement As a subcontractor to The Ross Group, Nova performed the fueling portion of this project and provided for the phased demolition and...
Replace Jet Fuel Complex at Fresno ANGB, CA

Replace Jet Fuel Complex at Fresno ANGB, CA

Projects  CLIENT: USACE Sacramento  LOCATION: Fresno ANGB, CA  VALUE: $17,440,854 Replace Jet Fuel Complex at Fresno ANGB, CA The work of this project at the Fresno Air National Guard Base in California, included the demolition of an existing fuel system that...