Waterfront Construction

Nova serves the Navy and Coast Guard with both new construction and the refurbishment of wharves, piers, dry docks and their support facilities. These projects may include the build or repair of concrete decks, or in the case of drydocks walls; building or upgrading electricity, steam, fresh water, wastewater, communications and other utility systems; construction of support buildings; pile driving and installing fender and mooring systems; along with dredging.

LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

LAND-WATER INTERFACE AT NAVAL BASE KITSAP, BANGOR, WA

DRYDOCK 6 MODERNIZATION & UTILITY IMPROVEMENT AT NAVAL BASE KITSAP, BREMERTON, WA

DRYDOCK 6 MODERNIZATION & UTILITY IMPROVEMENT AT NAVAL BASE KITSAP, BREMERTON, WA

REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA

REPLACE STEEL NOTCH BRIDGE 1047 AT BREMERTON, WA

REPLACE SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA

REPLACE SALTWATER DISTRIBUTION SYSTEMS AT BREMERTON, WA

CONSOLIDATED DRY DOCKS A & B

CONSOLIDATED DRY DOCKS A & B

INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

INSTALL TWO PORTABLE BOAT DOCKING SYSTEMS

INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

INSPECTION & RECOATING OF MAIN PUMP NO.4 VOLUTE, DRY DOC 1

PIER 17 REPLACEMENT

PIER 17 REPLACEMENT

P-700 AIRCRAFT CARRIER WHARF

P-700 AIRCRAFT CARRIER WHARF

IMPROVEMENTS TO WHARVES D, E & F

IMPROVEMENTS TO WHARVES D, E & F

DRYDOCK 2 REPAIRS

DRYDOCK 2 REPAIRS

PIER 8 CONCRETE REPAIRS

PIER 8 CONCRETE REPAIRS

STRUCTURAL REPAIRS TO WHARVES 6, 6 1/2, & 7

STRUCTURAL REPAIRS TO WHARVES 6, 6 1/2, & 7

STAIR GUARDRAIL & RAILING DD1

STAIR GUARDRAIL & RAILING DD1

PW #2 REPAIR MAIN DEWATERING PUMPS & MOTORS

PW #2 REPAIR MAIN DEWATERING PUMPS & MOTORS

KUAHUA PENINSULA, PHASE II

KUAHUA PENINSULA, PHASE II

DEEP SEAWATER & SURFACE SEAWATER PIPELINE SHORE CROSSINGS

DEEP SEAWATER & SURFACE SEAWATER PIPELINE SHORE CROSSINGS

GENERAL PURPOSE BERTHING WHARF Y2

GENERAL PURPOSE BERTHING WHARF Y2

BRAVO 3 PIER REPAIR

BRAVO 3 PIER REPAIR

BRAVO 1 PIER REPAIR

BRAVO 1 PIER REPAIR

REPAIR UTILITIES, DESIGN BUILD

REPAIR UTILITIES, DESIGN BUILD

LAND-BASED SHIP HANDLING FACILITY

LAND-BASED SHIP HANDLING FACILITY

P-700A BERTHING WHARF, PHASE 2

P-700A BERTHING WHARF, PHASE 2

CVN MAINTENANCE PIER REPLACEMENT

CVN MAINTENANCE PIER REPLACEMENT

DRY DOCK 1 & 2 SHIP SUPPORT SERVICE

DRY DOCK 1 & 2 SHIP SUPPORT SERVICE

REPAIR PURE WATER DISTRIBUTION SYSTEMS

REPAIR PURE WATER DISTRIBUTION SYSTEMS

DRY DOCK 1 WALLS AND CAISSON

DRY DOCK 1 WALLS AND CAISSON

REPAIR FENDER AT MOORING G

REPAIR FENDER AT MOORING G

P-857 INSTALL MOORING DOLPHINS, SERVICE PIER B/7100

P-857 INSTALL MOORING DOLPHINS, SERVICE PIER B/7100

MISSION SUPPORT SERVICES FOR SSBN/SSGN

MISSION SUPPORT SERVICES FOR SSBN/SSGN

DRYDOCK 4 & 5 SERVICE GALLERY REPAIRS

DRYDOCK 4 & 5 SERVICE GALLERY REPAIRS

PIER 5000 DECK REPAIR

PIER 5000 DECK REPAIR

Perform Sewer Repairs

Perform Sewer Repairs

REPLACE FAILED FRESHWATER PIPING AT PIER 3

REPLACE FAILED FRESHWATER PIPING AT PIER 3

P-151 Replace Fuel Pier; Joint Venture With Shimmick

P-151 Replace Fuel Pier; Joint Venture With Shimmick

Small Craft Floats & Service Pier

Small Craft Floats & Service Pier

Repair Dewatering Pumps & Motors At Drydock 5

Repair Dewatering Pumps & Motors At Drydock 5

Land-Water interface at naval base kitsap

Land-Water interface at naval base kitsap

Nova Group, Inc. is an equal opportunity employer. 

SITE MAP

Nova Group, Inc. is an equal opportunity employer. 

SITE MAP